Friday, March 6, 2015

Rev 2: Day 5 - Getting to Rock City

Day 4 was spent traveling to Texarkana in preparation for our first regional in Little Rock.

We got to Texarkana with very little trouble, just a lot of rain.

The ride from Texarkana to Little Rock on a normal day should be about 2.5 hours, today it took us about 8hrs.

We started off driving along the snowy road which was perfectly fine, nice and slow going but very safe. We started hitting some ice so we pulled off at gas station to wait it out. We were there for about 2 hours waiting for the temps to rise above freezing. When got on the road again, though the ice had cleared near us but I-30 north of us was shut down and that was our route into Little Rock. We were able to find a route up 67 north to meet I-30 further east.

As we made our approach to the venue, we managed to get the bus stuck on a hill. This was highly unfourtante but thanks to the generosity of one of the members of the neighborhood we were able to at least move about 20 yards forward. This put us infront of one of the locked gates into the venue parking lot. With some calls to the Arkansas Regional Director we were able to get the gate unlocked. Then came the fun task of sliding the bus in reverse into the gate. Surprisingly all of this worked pretty well, and we had the robot into the venue at around 3pm.
Bus stuck in the snow outside of the venue
Once inside we started loading in at 3pm. That's 6.5hrs after pits had opened. We immediately go to work tearing down the old robot and getting it ready for the additions. The tear down was complete at about 5pm and we started the reassembly with only 3 hours to go till pits closed. We weren't able to fully rebuild the robot but we are very close to being able to pass inspection.




- Spectrum

"Effort only fully releases its reward after a person refuses to quit." - Napoleon Hill

Monday, March 2, 2015

Rev 2 Day 2

The 2nd rev is progressing, very little time left. We should be able to test tomorrow.

Sunday, March 1, 2015

Recycle Rush Rev 2: Day 1

The last month has been challenging. We had faced a number of set backs with our current design.

We started with a twisted and sheared hex shaft during our Week 0 Practice.

We looked at going to a chain design but that didn't work well.
We replaced that with a steel shaft and that fixed most of that specific problems.

Yesterday was the final straw we complete broke both of the Versaplanetary CIM output shafts on our arm gearbox. This was after we broke two Talon SRXs not 30 mins earlier.

After watching some of the week 1 event we decided are strategy wouldn't pay off even if we could keep find bandaids to fix the issues we were having. So we decided to completely rebuild our robot and have a plan to that at our first competition.

While taking apart the practice bot today we found out why are arm had been showing a lot of tilt. The lower arm bar is completely bent.


Here is a quick sketch of what we are planning to move too or at least the initial stage of the move. We wanted something that we could keep improving through out the year.

Our current plan
- Build up a fictional prototype on the practice bot in the next 3 days
- Replicate the changes with the parts that our in the bag, 30lbs of withholding, and COTs parts on Thursday at Arkansas
- Iterate throughout the season.

Current state of the practice bot.


- Spectrum

”I haven’t failed. I’ve just found 10,000 ways that won’t work.” - Thomas Edison